Keltic Engineering is pleased to have provided the site design and construction staking services for the addition of two 90 ft. x 135 ft. steel grain storage bins that provide an additional 1.2 million bushels of storage capacity. This installation required the creation of a Stormwater Pollution Prevention Plan to ensure site activity would be in compliance with environmental standards.
Project Aspects:
- Stormwater design
- Stormwater Analysis
- Stormwater Calculations
- SWPPP