Keltic Engineering, Inc. completed a five lot subdivision design located in the Cougar Ridge addition.

Project Aspects:

  • Site design
  • Water/stormdrainage design
  • Waterline inspections
  • Stormwater Pollution Prevention Plan
  • Construction staking
  • As-built drawings
  • Submittal to IDEQ for approval