Keltic Engineering provided the site design, traffic impact analysis, and stormwater SWPPP document for the site on Bryden Ave.

Aspects of the design include:

  • Parking lot
  • Site Design
  • Water, sewer, stormdrain design
  • ADA compliance
  • Sidewalks
  • Curb and Gutter
  • Traffic Advisement
  • Stormwater Pollution Prevention plan