Keltic Engineering provided the site design, traffic impact analysis, and stormwater SWPPP document for the site on Bryden Ave.
Aspects of the design include:
- Parking lot
- Site Design
- Water, sewer, stormdrain design
- ADA compliance
- Sidewalks
- Curb and Gutter
- Traffic Advisement
- Stormwater Pollution Prevention plan